Don't miss any news

Skip to main content

WWW.LOGISTICSINNOVATION.ORG

The online magazine for Switzerland, the EU and the rest of the world



Preventive maintenance included

September 15, 2025

A whole cavalcade of Kardex Mlog stacker cranes is currently
through roof openings into a high-bay warehouse at Tchibo's Bremen logistics center in the Neustadt
port area, using an 800-ton crane. A total of 22 stacker cranes are planned, with ten more to follow later this year.

Kardex Tchibo Outer 1 310


The first old stacker crane, including its conductor rails and guide rails, was replaced in May with a new  Kardex MSingle B-1200/41-ZT model. Replacing the 22-year-old, the Bremen logistics center efficiently future-proofs

Future-proof

As part of the project, Kardex Mlog is implementing an additional operating option at the rear aisle entrance. Furthermore, fire suppression systems are being integrated into the 22 control cabinets of the automated guided vehicles (AGVs) as well as into one stationary control cabinet.  Kardex Mlog's scope of supply includes not only the hardware but also the interface to the existing material flow computer and a service package with preventative maintenance, a hotline, and individually tailored spare parts inventory.

 

Kardex Tchibo RBG1 310Photos: Kardex

Tchibo operates around 900 shops in eight countries, over 24,200 retail outlets, and national  online shops. Through its multichannel distribution system, the company offers coffee and its single-serve coffee systems Cafissimo and Qbo, as well as a weekly changing range of non-food products and worldwide  €3.2 billion in revenue in 2023 with 10,708 employees


www.kardex.com

 

 

 

 

 








WAGNER Switzerland AG




Who is online

Currently, 3119 guests and no members are online.